Expertise · 3/5

Bespoke furniture.

A standard counter tells anyone’s story. We design the pieces that don’t exist yet — counters, displays, reception desks, sales furniture — and we design them buildable, because we know how they get built.

01 — What we deliver

  • Workshop drawings — dimensioned, detailed, in the language of the makers — not mood views
  • Materials and finishes — timbers, laminates, metals, hardware: named and referenced
  • Maker tendering — the right workshops for the piece, consulted on a priceable file
  • Fabrication follow-up — shop drawings checked, prototypes and finishes approved, installation tracked

02 — How it unfolds

  1. Use and constraints

    What the piece must do, carry, store, withstand.

  2. Sketch

    The piece drawn inside the world of the place.

  3. Workshop drawings

    The dimensioned file a maker can price without guessing.

  4. Tendering

    Workshops consulted, quotes compared on an equal file.

  5. Build and control

    Shop drawings checked, finishes approved, installation followed.

03 — Who it's for, and how much

Priced per project, after a thirty-minute scoping call.

Every site, surface and timeline changes the work: a posted price would be wrong one way or the other. The call is free of commitment, and the quote spells out exactly what it covers.

Remote: workshop drawings speak to makers without us in the room; control runs on shop drawings, prototype photos and calls.

05 — The questions we get asked

Who builds it?

Partner workshops — joiners, metalworkers, shopfitters — chosen for the piece, or your own maker if you have one. Either way the fabrication file is the same: precise, priceable, no interpretation.

Is bespoke necessarily more expensive?

Not necessarily: a piece designed for your budget, your dimensions and your use avoids the cascade of compromises of the almost-right standard. Cost is framed at the sketch, not at the end.

Can you deliver the drawings only?

Yes. Some clients take the workshop drawings and run their own maker; others hand us tendering and follow-up through to installation. Both formats exist; the quote separates them.

What lead times should I expect?

Design runs in weeks; fabrication depends on the maker and the piece. Tendering fixes a firm date before anything is ordered — that is one of its jobs.

What’s next

Thirty minutes is enough to scope a project.

A video call, your space, your constraints — and you leave with a first informed opinion. No commitment, no detours.